OBAMA's answer to naninaninani's Primary 6 Maths Singapore question.

done {{ upvoteCount }} Upvotes
clear {{ downvoteCount * -1 }} Downvotes
OBAMA
Obama's answer
23 answers (A Helpful Person)
1st
Find out the perimeter of the rectangular field= 2* (length+ breadth)

This will be the total perimeter (or length of the field) in “meters” for which fencing needs to be done.

Multiply this perimeter by the cost of the fencing/meter to get the total cost.

Total perimeter = 2*(450+120)=1140m
Total cost = 1140* 4.80= $5472
Answer = $5472.