Idk whr the 0.25 and 25 come from
15 min rest = 0.25 h rest
Total time taken = 1230 - 1000
= 0230
= 2.5 h
Rest cycle is simply
= time spent resting / total time
= 150 mins
His rest time is 15 mins.
15 mins / 150 mins = 0.1
Using minutes you will still get 0.1.
0.1 means 1/10 → 10%
(Remember % = per 100.
So 10% means 10 per 100 → 10/100
→1/10 → 0.1)
2h 15 min is the total time he spent on repairing
15 min is the total time spent resting...
So, total time he spent on this job
= 15 min + 2h 15 min
= 2h 30 min. It includes the rest time.
So 2h 15 min is the work cycle.
→ 90%
15 min is the rest cycle.
→ 10%
Total time he spent → 90% + 10% = 100%
→ 2h 30 min